Occupy Bangkok: 20 Jan 2014

Wittayu junction was still opened only one lane in the morning like last week. There was a set of tires and sand bags blocked two lanes of Thai – Belgium bridge.

There were two sets of barriers on Rama IV road, one was next to Soi Saladeang and another one was under the footbridge.


In the afternoon, the 2 barriers were still there.

In the evening, the barrier under the footbridge looked like this:

The protester guards did something with the barrier in front of Soi Saladeang.

The net was used as a blocker on one side of Thai – Belgium bridge.

The blocker at Wittayu junction was almost gone in the evening.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.