Occupy Bangkok: 24 Jan 2014

Wittayu junction was opened only one lane in the morning. There were two set of tires and sand bags with direction instruction signboard blocked two lanes in front of U Chu Liang Building.

In the afternoon, there was a speech at Silom junction (not at Lumpini stage) and a small group of protesters marched on Silom road.



There were a lot of street food on silom road.

In the evening, the barriers in front of U Chu Liang building were still there. Thai – Belgium bridge was opened one lane. The barrier at Wittayu junction was opened too.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.